1 | Unfold each side and bend the gabion as indicated by the red lines in the diagram. | ![]() |
2 | Fold the panels as shown in the diagram, so that the edges meet and the gabion starts to take shape. | ![]() |
3 | It is important that you start lacing the panels at the front bottom right corner using either lacing wire or c-rings. | ![]() |
4 | Then you carry on with the front bottom left corner. | ![]() |
5 | Lift and vertically fold the back side. Lace the right corner. | ![]() |
6 | Repeat the procedure with the bottom left corner and lift the partition. | ![]() |
7 | Close the lid and make sure that the gabion sides are aligned before lacing them. The gabion is now ready to fill. | ![]() |